
The TTMJ System filed trials took place in Cesena
The field trials of the TTMJ System took place in March 2019 at TREVI’s sister company SOILMEC’s factory in Cesena Italy, using the steel lined shaft 1.5 m wide, 3.0 m long and 20 m deep.
The field trials consisted of the following phases:
The profiles of the three pre-cast beams tested
Concrete surface and embedded TTMJ tracks after trimming